LL2 · LLL review board

DanubiSoft: 500 more Instantly-ready leads

SKETCH · REVIEW ONLY

Historical verification lessons and autonomous execution, authorized by Matt on September 30.

Execution: not launchedRun: danubisoft-instantly-500-20260930Updated: 2026-09-30

Current path to the deliverables

CURRENT STATE

Current state

Latest domestic manufacturer campaign preparation is being reconstructed. Historical unfinished cohort counts are not accepted leads.

INPUTS

Available inputs

  • Current request · confirmed — Reconstruct all related campaign-preparation sessions, then launch one GPT-6.1 Sol High agent autonomously for 500 more Instantly-ready leads. Strict outcomes, independent choice of methods.
  • Source-grounded verification lessons · open — Fresh Luna Max extraction and full-transcript reading are in progress. Separate domestic manufacturers from European partner acquisition and website-sales leads.
DESIRED STATE

Desired state

Exactly 500 additional distinct eligible domestic manufacturers with verified business contacts, grounded Hungarian personalization and an import-compatible batch, with row-level proof.

OBSERVABLE DELIVERABLES

Deliverables

  • Source-linked session gists and an honest end-to-end reconstruction.
  • An exact 500-row compatible export plus a reviewable lead table and verification receipts.
Deliverable details

How the latest leads were prepared

Current problem: Old preparation totals describe different cohorts and changing qualification rules.

Proposed change: Reconstruct the relevant sessions, preserve contradictions and identify verification examples.

Visible at: History synthesis and per-session gists in the local deliverable index.

500 more Instantly-ready leads

Current problem: No new accepted 500-lead batch exists yet.

Proposed change: Have one autonomous Sol High agent prepare, verify and personalize 500 additional companies using the recovered campaign requirements.

Visible at: This same stable board, completed batch download and final verification report.

Choose the next request

Request a revised sketch at the same detail level: annotate changes, and I will update this same board.
Request the full contract: ask me to expand this same board with criteria, sourced constraints, and evidence expectations.

Neither request starts execution. A later explicit Launch is still required.

Preview (illustrative, not test proof)

Illustrative trigger → action → outcome · not test proof

TRIGGER

Historical requirements

Recover confirmed historical requirements

ACTION

500 new qualified contacts

Qualify 500 additional manufacturers and contacts

HANDOFF

Copy and import checks

Validate grounded copy and exact field compatibility

OUTCOME

Verified batch

Deliver an evidenced import-ready batch