Status: DONE

Result

Both landing variants now distinguish the proposed daily pilot estimate from Rita’s original module-level times. The estimate is visibly unconfirmed and not Rita-approved, original module times remain separate, and recording plus journaling are additional. Daily video and personal feedback from Rita remain in the offer.

Deliverables and checks

Deliverable Requirement or verification Result Evidence
challenge-a.html Replace the old source-labelled estimate in the time card, its note and FAQ PASS The card at line 343 is labeled “Napi gyakorlási becslés.” The note and FAQ at lines 351 and 525 say 20 minutes per day on days 1–10 and 30 minutes per day on days 11–14, pending discussion with Rita. They separately identify source times of about 20 minutes per original module 1–5 and 30 minutes for module 6, with daily video and journaling extra.
challenge-b.html Correct repeated routine and FAQ wording PASS Lines 308 and 442 now distinguish the pilot estimate, original module times and extra recording/reflection time. The old “első öt témánál” wording is absent from both pages.
Durable landing copy source Keep future source generation and matching copy records aligned PASS Updated prepare.py (local evidence: /Users/agency/Documents/Agty/KomplexLogopédia/outputs/rita-journey-20261002/private/landing/prepare.py), content.json, content-final.json, the two matching challenge copy drafts, and PRODUCT.md. The source checks confirm all five duration fields and the separate daily-estimate card are synchronized.
Original module guidance Confirm the source values used in the corrected copy PASS Modules 1–5 each retain a ~20 perc line and module 6 retains ~30 perc. Exact lines are listed in copy-contract-check.json.
Mobile rendering Capture affected copy at 360, 390 and 430 × 844, DPR 1, for both pages PASS All six real viewport captures are 200 responses with matching pixel dimensions, no horizontal overflow, and the relevant time section inside the viewport: A 360, A 390, A 430, B 360, B 390, B 430.
Copy and browser checks Verify the revised copy, retained daily-video/Rita-feedback promise, no em dash or semicolon, and no page runtime errors PASS mobile-verification.json and copy-contract-check.json.

Limits or consequential decisions

The local server returned a shared /favicon.ico 404 on challenge A. The page itself returned 200, with no runtime errors or failed page-asset responses. The shared favicon is outside the assigned page-copy scope. No publication or hosted deployment was performed.